The prices are given on 01.05.2006
The corporate objective of the Limited Liability Company "Ecostroimaterialy" is to produce small wall blocks and other building products from the aerated concrete (the cellular cement non-autoclave concrete); monolithic works on the preparation of the aerated concrete mixture in the conditions of the construction site; the pro-duction of the ferroconcrete sewer manhole and ceiling panels for them. All men-tioned above construction materials are offered to our customers as on the territory of Belgorod region so as on the territory of Russia.
Moreover we are occupied with the designing, production and supply of the high-technology equipment for the production of the aerated concrete
The equipment for the production of the non-autoclave aerated concrete
(is not valid on the territory of Belgorod region)
Special offer (for small enterprises)
|
Mobile plant for the preparation
of the aerated concrete ÑÏÁÓ (BACU) - 125
|
|
Characteristics of the equipment
|
Notes
|
Cost, $
|
|
ÑÏÁÓ (BACU) - 125-M
(the productivity m3 of the aerated concrete per hour)
Volume of the batch - 125 liters
|
| Cost at payment by transfer (the compressor is not in-cluded into the supply com-plete set) |
Voltage in power circuit - 380V
|
2 800
|
|
Cost at payment by transfer (the compressor is included into the supply complete set)
|
3 150
|
ÑÏÁÓ (BACU) - 125-M1
(the productivity m3 of the aerated concrete per hour)
Volume of the batch - 125 liters
|
|
Cost at payment by transfer (the compressor is not included into the supply complete set)
|
Voltage in power circuit - 380V
|
2 965
|
|
Cost at payment by transfer (the compressor is included into the supply complete set)
|
3 310
|
The equipment for the production of the non-autoclave aerated concrete with the density 250-1000kg/m3
|
Equipment
|
Cost, $
|
| |
|
ÑÏÁÓ (BACU) - 250 - M (new equipment at reduced prices!!!)
(the productivity is 3m3 of the aerated concrete per hour)
Volume of the batch - 250 liters
|
| Cost at payment by transfer (the compressor is included into the supply complete set) |
4 077
|
| Cost at payment by transfer (the compressor is not included into the supply complete set) |
3 660
|
| |
ÑÏÁÓ (BACU) - 500 - M (new equipment)
(the productivity is 5m3 of the aerated concrete per hour)
Volume of the batch - 500 liters
|
| Cost at payment by transfer (the compressor is included into the supply complete set) |
5 890
|
| Cost at payment by transfer (the compressor is not included into the supply complete set) |
4 950
|
| |
|
ÑÏÁÓ (BACU) - 1000 - M
(the productivity is 7m3 of the aerated concrete per hour)
Volume of the batch - 1000 liters
|
| Cost at payment by transfer (the compressor is included into the supply complete set) |
6 865
|
| Cost at payment by transfer (the compressor is not included into the supply complete set) |
5 925
|
| |
|
3. Technological equipment and rigging
|
|
Drafts of the cassette forms (2 types)
|
174
|
| |
|
4. Outlay materials for the production of the aerated concrete
|
|
Frother "Morpen"
|
1,5 $/kg
|
The guarantee service life of any item of the equipment is 12 months and more. |